Showing posts with label Cycling Infrastructure. Show all posts
Showing posts with label Cycling Infrastructure. Show all posts

Monday, June 12, 2017

Joint Letter Requesting Cycling Safety on Bayview

Our cycling advocate friends to the west and north of us recently sent a joint letter to several councillors and the mayor.  They requested for safety improvements on Bayview.  When you look at the map, it's quite striking how fragmented and incomplete the infrastructure is now. Please consider writing to the below councillors today in support of this.



To: Councillors John Burnside, Mary Fragedakis, Pam McConnell, Jaye Robinson, Kristyn Wong-Tam
CC: Councillors Josh Matlow, Christin Carmichael-Greb, Mayor John Tory

June 5, 2017

In light of the horrific and entirely preventable death of a 5-year-old on Lakeshore Blvd last week, we request the rapid installation of safety barriers onBayview Avenue between Pottery Rd and Moore Ave, and the initiation of a safety study - emphasizing cyclist safety - of Bayview Avenue over its entire route from Moore Ave to River St.
Bayview has been identified as a priority cycling corridor for over 20 years.  Bayview is the only on-street cycling connection from Midtown, North Toronto and Leaside to the Lower Don Trail system, the Don Valley Brickworks, and downtown either via Rosedale and the Sherbourne bike lane or via River St. This route is used by thousands of young and old people who ride bikes, from experienced riders to families out on a leisurely ride. This route is also used by speeding motorists as though it were a major expressway, despite Bayview being designated as a city road.  Evidence strongly shows that motorist speed is directly linked to collision frequency and severity, therefore this higher-speed corridor presents a high risk to cyclists. 
City Council in 2005 endorsed the Don Valley Corridor Transportation Master Plan, which recommended a full Environmental Assessment for Bayview. Unfortunately, this study was never completed. 
In 2016 the City reconstructed the roadway between Rosedale Road and Moore Avenue which included (1) installation of a guardrail on the east side ofBayview, between Rosedale Valley Road and Pottery Road and (2) widening of the paved shoulder from Pottery Road to Moore Avenue, so that it is in effect a bike lane.  Unfortunately, no guardrail was installed north of Pottery Rd, and simply widening the shoulder is an inadequate safety measure. 
Also in 2016 Councillor Fragedakis tabled a motion, approved by Council (2016.MM18.10) for a functional study of Bayview including cycling safety.  Unfortunately we learned earlier this month that City staff aren't even preparing to start this study.
This is unacceptable.  We don't need to wait for tragedies like this to happen before we install basic safety features such as guardrails on bike routes next to high-speed roadways.
Therefore we recommend to:
  1. Designate Bayview Avenue from Pottery Rd to Moore Ave as a cycle track, in accordance with the City’s 2016 Cycling Plan.
  2. Separate the new bikeway from the roadway using appropriate technology such as guardrails or Jersey barriers.
  3. Service the new bikeway to cycle track standards (regular sweeping, pothole repair, snow clearing, etc).
  4. Request Transportation Services to report how additional safety measures on Bayview Avenue between River St and Moore Ave can be addressed, including extending the bikeway south from Rosedale Valley Rd, widening the paved shoulder further, and closing the gap southbound between Moore Ave and Nesbitt Ave.
  5. Fully engage with the cycling community as a stakeholder during the City study.


On behalf of the users of Bayview Avenue,
 
John Taranu & Tom Worrall
Cycle Toronto Midtown
Ward 16 & 22 Advocacy Group
Alex Korobchevsky & Georgina Wilcock
Cycle Toronto Ward 25 Advocacy Group
Geoff Kettel & Louis Fliss
Cycle 26
Ward 26 Advocacy Group
Peter Rogers
Cycle Toronto Ward 28 Advocacy Group
Tom Flaherty
Ward 29 Bikes
Ward 29 Advocacy Group
Alison Stewart & Chris Hoyle
Cycle Toronto Yonge Working Group



-- 

Wednesday, May 3, 2017

Viaduct Protection is Back

The Toronto Cycling unit announced on twitter this morning that they are re-installing the bollards on the viaduct



You may remember that these were installed (much to our surprise) back in October and then removed after 6 weeks.

No word yet if this is another pilot, but it's a welcome return.   Share with us here on on twitter your feedback.  let us know what you think of the flexi-sticks.

Tuesday, October 11, 2016

Woodbine Bike Lanes Approved - First Ever Protected Bike Lane for East End!

City Council met last week and we're thrilled to report that the Woodbine Bike lanes were unanimously approved! Not much in Toronto's cycling world happens unanimously, so this is special!


It's also the result of some serious outreach efforts from our friends at Ward 31 and Ward 32 advocacy groups, the efforts of the local councillors who really pushed hard for this, and city staff who organized a massive public outreach.

And it's not just a painted line!  Buffers and flexi posts!   Is this the best that cycling infrastructure can be?  No, not at all.  It's unlikely Scandinavian traffic engineers are going to get any best practice tips from this. BUT its moving in the right direction.  Buffers are better than single painted lanes.  And buffers turn into flexi posts, flexi posts turn into curbs or planters.   Curbs and planters turn into full fledged separated from vehicles paths like the waterfront trail.

You can read more here





































Stay tuned for the installation!

Saturday, August 13, 2016

Carlaw + Dundas Public Realm Initiatives - visioning a network of 'people-safe' corridors that connect local destinations


By Michael Holloway - member, Ward 30 Bikes

This article is intended to initiate a discussion towards creating more people-centred public spaces along the flanks of the Carlaw Avenue Corridor between Queen and Gerrard via a very-local network of complete streets treatments and multi-use paths that together, become 'Invitations' to active transportation choices; routes that will - for walkers and cyclists - connect neighbourhood destinations and public amenities already in place along this dangerous corridor which is congested with motor vehicle traffic most of the day.

Below is Ward 30 Bikes representative, Michael Holloway's submission via the Online Survey posted for the 3rd round of the Carlaw + Dundas Public Realm Initiatives public consultation (as per the June 21, 2016 Open House at Morse Street School Gym - http://www.carlawdundas.ca/about-project). Michael Holloway attended all the events through this two-and-a-half year process.

Only the sections of the survey where Michael wrote in feedback are represented in this article. This edited presentation does not include all the Options, or the Images that supported unanswered Options that appeared on: the paper survey; the display boards at the Morse Street School event; or in the Online Survey (which is unfortunately now closed - http://fluidsurveys.com/s/CarlawDundas/)

_________________

Page 2 (16%)

Preliminary Jimmie Simpson Gateway Concept Design Options

 

Option 1 - Colgate Avenue Gateway

[no answer]

Option 2 - Colgate Avenue Gateway



Option 2 - What do you like? Why?

Like. Arc is welcoming.

Option 2 - What would you change? Why?

Ornamental Grasses - replace with naturally occurring vegetation in a bioswale - which pools temporarily, runoff from storm events in a wet/dry bowl feature planted with naturally occurring vegetation. Funnel the entrance feature and near-by sidewalk's run-off into this bioswale.

Perhaps copy at this entrance the existing stainless steel checker plate, 19″ high letter inlay in the sidewalks at the corner of Queen/Broadview? Perhaps with the words "Jimmy Simpson Park"

---

The Entrance feature is for active transportation modes - so it is an entrance way for pedestrians, cyclists, parents with strollers, skateboarders, elderly with mobility devices, the blind using their canes, and so on.

So:

1) Create a pedestrian and cyclist friendly Colgate Ave from Carlaw to Booth (I suggest wider sidewalks between Carlaw and Natalie Place; bike lanes along the entire stretch where possible, sharrows where not possible - safety treatments at transition pinch points (like where the roadway changes widths at Natalie Place); dedicated cycle crossing lanes beside the cross hatches of a new crosswalk across Colgate/Booth;

2) Create entrance features that assist active transportation modes - narrow the crossing area at Booth with bump-outs, add dual pedestrian crosswalk / mounted cyclists' crossing, add blind (and sighted) crosswalk signals;

3) Create pathways in the Park that allow egress for all active transportation modes, to and from the Park's amenities.
(Best practice might be to wait some time after the entrance way is completed and investigate where people travel in the Park via the new entrance - and then add appropriately placed Multi-use Trails at a later date);

4) And add elements along those routes which support the people using them at the amenities which they are using - like 11 Ring & Post bike lock-ups for the soccer field (ie. enough lock-ups for two full teams) placed along the west side of Booth north of Colgate connected to the entrance feature via a Multi-use Path; similarly at the skating rink, basketball pad, tennis pad, hockey pad - and especially - at the main entrance to the recreation centre.
(Existing are too few and badly placed - currently hidden under a tree with no lighting; rather, needs to be 'front and centre', well lit, and near the doors ... in order to keep 'eyes' on the lock-up area. Also, the existing bike lock-up amenity is of bad design and is broken and rusting).

Option 2 - How does the proposed concept meet your needs?

[no answer]

Option 3 - Booth Avenue and Queen Street Gateway



Option 3 - What do you like? Why?

Arc is welcoming.

Option 3 - What would you change? Why?

Existing feature has bad sight-lines at night - feels scary there - seating is hidden away in the shadows; the entire construct blocks a view into the Park behind it. Open it up, but at the same time provide a friendly space to hang out and active transportation amenities for those who travel to the Park via this entrance-way.

Option 3 - How does the proposed concept meet your needs?

[no answer]


Page 3 (50%)

Preliminary Boston Avenue Boulevard Improvements

What do you like? Why?

Like the walking path - but it ends at a parking lot. People using the space have created their own walking path - installing a regulation path won't help the underlying issues -> no sight-lines, dark, path doesn't connect Dundas to the residential buildings.

In my opinion, connecting the walking path to the residential buildings is the only way to create a sustainable public space here; otherwise this is a waste of money.

To make this connection, perpendicular private parking on the west side of Boston from the empty lineal space down to the south face of 245(R) Carlaw should be ended somehow - perhaps an accommodation with the landowners (if this is private land) to improve the back of their building (tattered old fence, rutted gravel driveway) at the same time as a sidewalk and a boulevard is constructed.

This could be done by swinging the parking to parallel along this section, which at the same time would make room for a connection between the winding path to the existing sidewalks to the south. Plus there are lots of empty parking spaces in the lot at the southeast corner of Dundas/Boston.


Bike Lanes

Also, Boston is a good candidate for a contraflow bicycle lane. A northbound contraflow on Boston would help residents of the nearby developments connect to Dundas - and via Heward - to Eastern.

Queen / Carlaw intersection centres a vibrant local community, Boston as a north-south bike route allows 8/80 cycling to the Dundas and Eastern Avenue Bikes lanes (which provide an 8/80 route to the lake front).

Carlaw is not a presently a cycling street. It is congested during peak hours (7 hours a day) with tense, hopped-up LSB commute drivers.

Oddly, the street it is considered a 'destination' by planning staff - yet there is no safe way to bicycle to any of the places along Carlaw between Queen and Dundas; thus connecting cyclists to area destinations - and nearby commuter routes - via Boston and via Logan/Colgate as I've stressed above) would be an ideal alternative to Carlaw.



Page 4 (66%)

Signature Marker Design Competition Shortlist Submissions

Submission #3: Pierre Poussin - "Brick Obelisk"

Best of the lot. But penile, and there's already too much of that at this corner.

How about something penile that has to do with Trains (as it is on the historical railway easement).

Perhaps a sculpture that evokes the classic railway signal post - made out of old rail tracks! (Classic railway signal posts:

Via Dr Elizabeth R. Tuttle Professor of Engineering, University of Denver - https://mysite.du.edu/~etuttle/rail/sigs1.gif


Or - a scale miniature of an old railroad station house - made of scale sized bricks?

.. An old railroad station house?

Via Esprit Co - http://edc.h-cdn.co/assets/cm/15/04/980x653/54c1a7c9c72a7_-_devera-edc-04-14-3-xln-xln.jpg





End




mh

Tuesday, June 28, 2016

FIX! - Lower Don Recreation Trail / Carlaw, Morse, Logan, Booth


By Ward 30 Bikes member,
Michael Holloway

Two recent collisions at LSB/Logan intersection got people writing letters to Councillors - and in their social media networks.

Google Map image mark-up of LDRT between Don Roadway and Leslie Street with dangerous intersections indicated at Carlaw, Morse, Logan and Booth.


On April 5, 2016, Ward 30 resident Paul Farnan came upon an accident as EMS was taking away the body (injured cyclist - he survived) and posted about it in Facebook at "City of Toronto Cycling" (https://www.facebook.com/photo.php?fbid=10153993290071147&set=gm.1310963815586267&type=3):


The discussion after Paul's "City of Toronto Cycling" share was extremely well populated - including a post by the guy who got hit (bruised ribs) - here: https://www.facebook.com/groups/140997182582942/permalink/1310963815586267/?comment_id=1311040918911890&comment_tracking=%7B%22tn%22%3A%22R9%22%7D


Discussion Group Formed


Then on April 12, 2016 Doug Wedel (from Ward 13?), shared Paul Farnan's City of Toronto post to a new group he set up called, "FIX the MGT Logan/Morse/Booth Safety Analysis and Solutions Study".

The conversation is ongoing at this group.

On May 15, 2016, Ward 30 Bikes member Gerry Brown posted a short video showing what was happening at Lake Shore Blvd/Logan that was causing the collisions - noting that drivers were preoccupied with the continuance of their lives, as they try to merge onto LSB westbound from the local street - apparently in the video he took - never looking west to see if there were cyclists coming eastbound on the Lower Don Recreation Trail (LDRT).

Gerry Brown May 15
"A short video that pretty much sums up the problem. Although you can't see it in the video, the driver's head is turned left the entire time, looking for Lakeshore traffic and 100% unaware of any eastbound cyclists on the MGT."

(Watch the video in Facebook (account, 'Join' public group) - https://www.facebook.com/groups/856664931127019/permalink/875079175952261/ )



Lots of discussion there until just over a month later - another collision in the same spot!




Not sure how this victim fared - please comment if you know if they're OK - or what.
 
At that point Ward 30 Bikes sent the letter we had been drafting, into Councillor Paula Fletcher's Office (as did several other citizens also, apparently).

On June 11th the Councillor's Office sent emails to all concerned announcing she had set up a Site Visit for Wednesday June 22, 2016.

Public Analysis of the Intersection


Using this 'what the eyes of the drivers are doing' approach, a couple of people from the discussion group went out on their own and did 'traffic counts' - counting for example, how many drivers didn't look west before turning, and doing a survey of drivers using Logan southbound.

I followed those counts up with a proper Traffic Turning Count - recording what drivers did with their vehicles at the intersection - rather than what they did or did not see. (I always assume humans are social and empathic - and are not trying to kill cyclists. That understanding leads me to the understanding that the infrastructure configuration is at fault - not the way people are using it. The result is no victim blaming - and progress in traffic engineering and philosophy).

Here's my Traffic Turning Count graphic (the best way to read a traffic count):


Full size: https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhRlXG_e2SfoqM21bkD09NCd17Dof_RU-ZdXmIV7ZwhdAE9Rdf8oiqwzRp-B6C6_vC9rJamBjQLVwSzWgZLBcy7FAzNcmezcT7PjqxEhPyYLNnhYuOpBlcN6qTbLTQDpXeY1POHznk0ceNw/s1600/LDRT-Logan-LSB+Intersection+Traffic+Count+June+20+2016+Google+Earth+View.jpg

I used a legal framework to count actions and results.

From my comment under my count graphic published at the 'FIX' group (https://www.facebook.com/groups/856664931127019/permalink/897437317049780/):

  • Did the driver stop at the Stop Line?
  • Did they slow or stop on the path? (Thus blocking it, which is illegal - cyclists have right of way here.)
  • What happened when the two modes came in conflict (driver blocking the path at the same time as a cyclist was approaching the intersection).
  • What was the quality of the conflict? (Almost a collision? Was the cyclists able to see the danger before it happened and break or steer around?)
  • The rest is just counting numbers and noting where they went (go straight, turn).

Also under the graphic - my conclusions (my additions here for clarity, inside square brackets):

So this quantifies the degree [and quality] of the problem:
  • Of the 135 motor vehicles who tuned the corner onto westbound LSB, 79 of them blocked the Trail to one degree or another. (That's 59% !)
  • Of those 79 blockages of the Trail, 26 cyclists either had to steer around the vehicle or brake (remember cyclists have right of way here).
  • Of those 26 incidents, 5 were near collisions [one or the other - or both - road users had to apply emergency braking to avoid a collision] where my stomach jumped into my mouth and my adrenaline surged as I thought I was about to watch someone get hit.

Conducting this count was not a pleasant experience - for the rest of the day I was in a degree of shock from my experience of all the near misses.

The Site Visit


Then the day came for the site visit.

These are my report back notes about the site visit that I posted the day of at Ward 30 Bikes (group - https://www.facebook.com/groups/148229472024000/permalink/573888786124731/?comment_id=574293146084295&comment_tracking=%7B%22tn%22%3A%22R1%22%7D):

Sylvia (Ward 30 Bikes' Co-chair) asked:
How did the meeting with city staff go this morning?

I replied:
More, Better, Bigger signage on LSB and on the local streets approaching LSB; plus green paint on the Trail across all the intersections (Carlaw, Morse, Logan, Booth) plus paint on the Trail warning cyclists that they are approaching an intersection.

Transportation/Planning will get back to the Councillors' Office concerning planning progress in 2 weeks.

Also asked for signage for eastbound LSB approaching Carlaw warning drivers to watch for cyclists eastbound across the Carlaw intersection.

We need to monitor the effectiveness of these treatments after they are completed, and then I expect it's onto something more expensive and invasive.

The Councillor said she will not stand for closing any of these streets to LSB because of the negative impact on the South of Eastern Employment District (Don River, Eastern, Coxwell, LSB).

And then in the next comment later that day, I added:

Also: Paula wants Carlaw/LSB signal timing returned to the condition that marked the period before the Leslie St reconstruction (during which Carlaw acted as an alternate route into the neighbourhood from LSB, and at which time parking between 4pm and 6pm was prohibited in order to free up an extra northbound lane during the Leslie closure);

.. and she noted during the meeting, that the roadway be returned to the condition that marked the functioning of the street during the period when the raised expressway ran through here (Carlaw as a minor arterial with relatively low traffic volumes).

To this end she successfully got the prohibition of on-street parking on the east side of Carlaw between LSB and Eastern between 4pm and 6pm rescinded (T&EY CC: http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2016.TE15.45).

Now she's adding, that the signal timing should be returned to the way it was before the Leslie St reconstruction as well.

And - just posted this today - as I had forgotten that we discussed this on the site visit too:
Forgot to mention that during the site meeting I brought up the condition of the rubber inserts that fill the flangeway gaps in the railway line that crosses the LDRT on an angle just to the west of Carlaw.

This Toronto Port Authority property.

Two years ago someone broke their shoulder here and a newspaper article made it a talking point * - Transportation asked Toronto Port Authority to make this crossing safe - they didn't have any flangeway inserts in stock so they lifted some old ones from an unused rail line and stuck them in at Carlaw.

Hoping the Port Authority have new flangeway inserts now, and can replace these now extremely worn ones as soon as possible.

I should also note here that I have been following this story for a few years now. Back in 2014 when the flangeway accidents happened, I was also aware of the dangerous condition at (especially) Logan/LDRT - and I published several articles with video of the intersection's deficiencies. See those articles here in Ward 30 Bikes at the Label "LDRT" (http://ward30bikes.blogspot.ca/search/label/LDRT).

So now we wait for news from the Councillor's Office for a progress report on the planning towards the improvements.

___________


* Global News - August 24, 2014 | Several cyclists hurt near dangerous part of road on Lakeshore By Cindy Pom | http://globalnews.ca/news/1526352/several-cyclists-hurt-near-dangerous-part-of-road-on-lakeshore/



mh

Friday, June 24, 2016

Danforth East public meeting on Monday - help make bike lanes on the Danforth a reality!

There's a public meeting coming up next week for the section of the Danforth east of us. Not Ward30, but very close to us.  Below is Cycle Toronto's action alert, if you can make it out to the public meeting please do!



City Council recently reinstated the Danforth Corridor Study to determine the feasibility of bike lanes on the Danforth. This Monday, planners at the City are hosting a community meeting for a separate Danforth Avenue Planning Study, and we need you to remind them how important bike lanes are to the vitality, economy, and growth of the Danforth. This meeting is especially important as the study area intersects with Woodbine Ave, which is also being considered for future bike lanes.

The consultation will take place Monday, June 27th, 7:00pm to 9:00pm, at the Hope United Church (2550 Danforth Ave).

If you live, work, or play along the Danforth, this meeting is an essential opportunity to share your comments and concerns about cycling infrastructure with City staff. We urge you to go and have your voice heard.

Learn more about the project on the City's website.

Cycle Toronto is your voice at City Hall. We fought for bike lanes on Richmond, Adelaide, and Bloor, and the Danforth is next. Support our work by joining our more than 3,000 members or donate now.

We hope we can count on you. 

Jared Kolb
Cycle Toronto

Wednesday, April 27, 2016

Bikes Mean Business!!

Last week our event Bikes Mean Business was a huge success!

Left to Right:  Brandon (Ward 30 Bikes), Jared (Cycle Toronto), Billy (Chair of Danforth Mosaic BIA and owner Red Rocket Coffee, Councillor Fletcher, Sylvia (Ward 30 Bikes), John (owner of Allens' and Dora's)
- photo credit: Councillor Fletcher's office

This event was a collaboration between all the east end Ward groups within the #DanforthLovesBikes working group and Cycle Toronto. We pulled people from across the community and wider city to discuss and celebrate the amazing economic benefits of bike-friendly streets!



Yvonne Bambrick, author of The Urban Cycling Survival Guide and Executive Director of the Forest Hill Village BIA kindly MC'd our event.

Yvonne Bambrick introduces Billy Dertilis Chair of Danforth Mosaic BIA and owner of Red Rocket Coffee
The turnout was great - we had Dora's packed!


Councillor Janet Davis (Ward 31) and Councillor Paula Fletcher (Ward 30) front and center

First to speak was Councillor Paula Fletcher who gave her full support for studying bike lanes on Danforth. She talked about the collaborative work going on to improve bike parking (Danforth BIA + Ward 30 and Ward 29 bikes + her office), and she talked Bike Share.  It's coming to the east side - scheduled for this year! And she reassured the audience that protection the viaduct lanes is something she is still pushing for.

And then we went right into the research and the facts.  Matthew Lynch from the World Council of City Data and from Toronto Cycling Think and Do Tank spoke to the pure statistics that have shown that bikes are in fact really good for business (full presentation in this link).

Nancy Smith from the Toronto Centre for Active Transportation who also spoke to the research and facts. (A Danforth research study can be found here)

Councillor Mary Margaret McMahon (Ward 32) followed up as did Councillor Janet Davis (Ward 32) who both gave enthusiastic words of support for a bike friendly Danforth that includes bike lanes!

Jacquelyn Hayward Gulati Manager of Cycling Infrastructure Programs from the City of Toronto staff kindly came out and spoke to the packed room about the 10 year bike plan and the process for consultation and collaboration. We were so fortunate to have city staff join us!

And then our host for the night spoke.  John Maxwell owners of both Dora Keogh's and Allens:

John Maxwell business owner speaks to the crowd
A strong supporter for a bike friendly Danforth his words were particularly moving.  He agreed with all the research that was presented, but added... there is more to life than business, right?  He ended his speech with very thoughtful words about life just being better with people friendly streets.

Billy Dertilis owner of Red Rocket Coffee and Chair of the Danforth Mosaic BIA added with more words about businesses that do want to see a bike friendly Danforth. It was really fantastic to have local businesses sharing their support.

Jared Kolb from Cycle Toronto wrapped up the night speaking touching on the concepts of working through change.

What a night!

After all the speakers everyone had a chance to enjoy drinks and to chat.  It was so good to see local Danforth BIA Executive Director Susan Puff in attendance, as well as owners of the Second Cup on Danforth and Dough Bakeshop.  Riverdale Cleaners was there too.  I saw some members of the Playter Estates Residents Association taking it all in, and a few from DECA. I'm sure there were many many more  there too.   The crowd was really diverse.

So behalf on all of us who planned this event, thank you to everyone who joined us that night!


- Ward 30 bikes




Presentation Resources:
Toronto Cycling Think and Do Tank: Cycling Economies

TCAT Bike Lane Economic Impact Study for Bloor Street Toronto 

TCAT BIKE LANES, ON-STREET PARKING AND BUSINESS: A STUDY OF DANFORTH AVENUE IN TORONTO’S DANFORTH NEIGHBOURHOOD

NYC Statistics and Facts from Bike Lanes and Street Redesign
 



Monday, February 22, 2016

Draft 10 year Bike Plan: Another Round of Feedback for City Staff

Over the weekend City Staff from the Cycling Unit gave up a solid block of hours to meet with representatives from Cycle Toronto Ward Groups to talk about their latest draft map for the city.  Thanks to those who joined us on Friday night to brainstorm ideas

There we are at a table covered in maps. pic: CycleToronto


Are we still talking about a DRAFT map?  ya, we are.  Its a long process, but we can report back that it is careful and with thoughtful planning.  With a limited budget to spend each year, city wide projects need to be ranked to decide what happens when.  So we don't always get what we want when we want it, but know that other parts of the city are being worked on.  

Want more sooner?  Demand a bigger budget! Submit your comments to Public Works Infrastructure Committee - NOW.  The cycling budget will be discussed at the next meeting February 29th. Do it!



Back to the map, some interesting things:

- Eastern Ave over the DVP has something planned.  Sorry to say we didn't get many details about what they want to do there, but there was a spark of excitement in their eyes.  However, this one is a 'few years' away.

- Danforth, Danforth, Danforth! (sign the pledge if you haven't yet!). It's in the draft, it's been in every draft.  And for our Ward, I'd say this is *the* project they want to focus on. ya!

Want to hear more?  come to our next meeting to find out:

Tuesday March 1st 7pm
Ralph Thorton Centre
765 Queen St. East

Thursday, August 27, 2015

Advocacy in Action: Ramp to Lower Don Trail

It's coming! Success!

Remember our ongoing work on the Lower Don Trail? This struggle to access the Lower Don Trail will soon be a thing of the past!































First Attempt
In 2012-2013, when the City of Toronto commissioned a Master Plan for the lower Don Trail, public consultations were held. At that time we advocated for accessible ramps to the trail.  But when the final plan was released we were all disappointed to see that more staircases were proposed to access the Lower Don Trail at Gerrard Street East and Dundas Street East, but without including ramps to provide universal access.

Second Attempt
Not satisfied with the result, advocates from across the community came together. With Ward 30 Bike's Michael Halloway taking the lead.  We did some scouting, mesasuring, calculating, and sketching, and came to the conclusion that a ramp option is absolutely viable. Ward 30 Bikes authored the April 2014 report “Creating Accessible Connections: Ramps to the Lower Don Trail at Dundas and Gerrard,” which was endorsed by Walk Toronto, Cycle Toronto Trails Working Group, Ward 28 Cycling Advocacy Group and Ward 29 Bikes. The Lower Don Trail project team reviewed the proposal and other community comments received. The project team unfortunately concluded that ramps could not be included in the project.

Third Times' the Charm
Still not satisfied, we took our concerns to our local councillor Paula Fletcher who in turn organized a site visit and then put in a formal request to the Parks and Environment Committee to reassess the accessibility issues.  Walk Toronto also submitted its own “Lower Don Trail Accessibility” report in August 2014. 

Success!
Paula Fletcher shares the good news at Bells on Danforth
And then we heard the good news.  In March 2015, the city confirmed that a budget had been allocated to make the pedestrian bridge at Riverdale Park fully accessible with a ramp! Paula officially made the public announcement in June at the Bells on Danforth ride, and the design consultation process is underway (yes, we are part of the design process!). If all goes to plan, we could have the bridge done by next year! Stay tuned for results of the design process and celebrations when it opens.

Thank you to all the advocates involved!  Ward 28 and Ward 29 bike advocacy groups, Cycle Toronto's Trails Working Group, Walk Toronto, South Riverdale Community Health Centre, the Riverside BIA and everyone in the community who voiced their support for accessible ramps.  


Get involved
Want to be part of projects like this?  Join us! Help bring positive change to the community, and positive improvements to our neighbourhood!   We meet the first Tuesday of every month at the Ralph Thornton Centre.



** note, this is a post I thought we'd published back in July, turns out it was still sitting in draft!  Oops... it's old news now, but it's still exciting news to share! **



Thursday, June 18, 2015

Richmond Adelaide pilot expansion moves one step closure to reality

PWIC (Public Works Infrastructure Committee) unanimously approved the extension of the Richmond Adelaide cycle track pilot project to Parliament.  Here's what was approved:

1. Implementation of Richmond Adelaide pilot project extension to Parliament
2. Investigation of upgrading Simcoe between Front and Queens Quay to protected bike lanes
3. Investigation of upgrading Shutter Street and River Street bike lanes to protected bike lanes

Item 1 goes off to city council for approval in July.  Items 2 and 3 will be reported back to PWIC in September.  All great news!  Items 2 and 3 are of course very near and dear to our hearts in Ward 30. Protected bike lanes come all the way to the Dundas DVP bridge?  woah! 

Thanks to everyone who responded to Cycle Toronto's action alert and took the time to write into PWIC with their support of the pilot project extension, the sheer amount of letters recieved was noted by councilors.  The support did not go unnoticed: 

Letters of support for pilot project expansion.  Image taken by Jared from Cycle Toronto


Also of happy note, the Toronto Financial District BIA gave their support for the pilot project expansion in letter format and in person deputation.  Amazing! The city, cycling advocates and BIA's all working together?  Collaboration is a beautiful thing.



  

Wednesday, June 17, 2015

Local Councillors Support Fully Separated Cycle lanes on Dundas DVP bridge

Such great news to see local Councillors Paula Fletcher and Pam McConnell putting forward their support for east-west cycling connections east of Sherborne.  With all the great news about the Richmond Adelaide pilot project success, we're thrilled to see focus on safe cycling infrastructure moving east.

Read their letter to EYCC here

Thursday, May 28, 2015

Advocacy in Action! Keeping Bike Lanes During Construction Projects

It started in early January 2015.

The councillor's office emailed us to ask for some input on a section of the Dundas East bike lanes at Carlaw that would be impacted by a condo development.  The request from the developer was to close part of the bike lane as part of the staging area for the construction of their second phase condo.  A few hundred meters of bike lane closure would result in cyclists having to merge with motor traffic, a safety issue the councillor's office was looking to mitigate.  And this closure would last almost a year, right on the back of the bike lane closure right next door at the first phase of the condo development.  We were potentially looking at a grand total of 2 years of partial lane closures in what is in our opinion, the most heavily used bike lane in the east end.

So, a few ideas were suggested.  Maybe some sharrows and some signage that stated 'shared usage lane single file" would help motorists to stay alert for merging bike traffic.   But then one of Ward30bikes' members Vivien suggested something much safer.  On the south side of Dundas, directly across from construction  site were 4 on street car parking spots.  If we could temporarily remove those 4 parking spots during the construction period and restripe the road, all the lanes could shift south and remain open.  Bike lane, car lane, car lane, bike lane.    This sounded MUCH better than:  merged bike/car lane, car lane, bike lane, parking spots.

So we proposed it, and to our delight the councillors office and Streetcar developments were supportive.  A site visit was organised in February for us and also bringing in city staff.  The site visit went very quickly.  All parties agreed it could be done.

So, with a plan, things were underway.  Council approvals happened, but then we had to wait.  Mostly for weather conditions to improve to do the scraping and painting, but there were also some misunderstandings between city departments thinking it couldn't be done, but then in fact it could.    The group of us working on this really were hoping this would have happened in April, but such is life with city processes sometimes.

Eventually it did happen, and in early May our bike lane re-opened (to lots of cheers from us!).

A big thank you to Paula Fletcher's office for being pro-active on dealing with cyclist safety issues and asking for our input at the beginning.  Also a very big thank you to Streetcar Developments for being open to our ideas for keeping cyclists safe during their development work.



This story was picked up in the Beach Mirror: http://www.insidetoronto.com/news-story/5646319-dundas-bike-lane-re-opens-in-leslieville/

But also, just today PWIC voted unanimously in favour of improving cyclist safety during construction. Thank you to  Councillors Joe Cressy, Mike Layton, and Mary-Margaret McMahon for championing this at the committee.  

Monday, May 11, 2015

Riverdale Ave - a new east/west bicycle route that makes Riverdale streets safer

A group of residents here in Ward30 got together a few years back to put their heads together on the increasing traffic problem in Riverdale.  They've since put together a draft proposal that aims to reduce traffic speeds, reduce total vehicle volumes, and discourage non-residential use of local streets.

As advocates for safe streets, we couldn't be happier to see like minded neighbours put their volunteer blood, sweat, and tears into making Riverdale safer.  We are thrilled with proposed speed reductions and bollards along the sidewalk in front of schools  - great idea!

But, there are also some issues with the plan that need to be addressed. Reversals of one-way streets in the current plan may compromise the ability of people to get around safely on bikes. Even more troubling is that one part of the plan includes adding "island parking" to the north side of Riverdale Avenue.


Here's the problem with island parking

On-street island parking compromises pedestrian, cyclist and motorist safety by creating visibility barriers. People crossing the streets, both on foot and on bike, especially young children, become hidden to motorists. One study of child pedestrian injuries found that "the number of parked vehicles was the strongest risk factor on residential streets." Island parking could also make the entire roadway a "dooring" zone, putting cyclists at further risk. We need a solution based on evidence, not on creating a false sense of security.

We think this plan can be even better!


The solution: bike lanes

We've got something else that can narrow streets, benefit all road users... AND encourage less vehicle volumes.  Bike lanes.  73% of Torontonians say the lack of cycling infrastructure in the city is holding them back from riding more.   73%!  We want to give people the infrastructure to meaningfully reduce vehicle volumes.

Even with negligible bike infrastructure, Riverdale is already a community of active cyclists:


Our proposal

Through a combination of bike lanes, we propose a bike route along Riverdale Ave / Boultbee Ave.

Please see map layer titled:  "Proposed Riverdale Bike lanes".  The proposal includes a combination of contra-flow bike lanes, protected bike lanes and sharrows.




You can view our full proposal here

A bike route connecting Broadview to Jones Ave will:

  • narrow streets (a riverdale traffic calming group goal)
  • reduce vehicle volumes by encouraging other methods of transportation
  • establish a safe east-west cycling connection to the existing Jones Ave bike lanes
  • traffic calm the section of Riverdale in front of Pape Ave Junior School with protected bike lanes
  • provide a bike to school route for:
    • parents cycling with their kids to Pape Ave Junior School
    • parents cycling with their kids to Blake Street Junior School
    • students going to Earl Grey Middle School
    • students going to Riverdale Collegiate Institute
  • provide a safe bike connection to Riverdale Park East and the Lower Don Trail

(note, we assume that elementary school children ride along the sidewalk, and caregivers and parents ride safely beside them in the bike lanes)

We met with the traffic calming group hoping they would include our plans in their proposal.  We were unfortunately disappointed to find that they did not put forward any bike routes in their draft proposal.

Riverdale is an awesome neighbourhood.  I live here, my kids go to school here.  And until our kids get drivers licenses, bikes will be primarily how they get around the neighbourhood.  Will my 5 year old use a bike lane now?  no... but when he's a teenager he will.  All our teens will.  Let's give them safe options to travel around our streets.

Why our plan works

We scouted the proposed route in November last year and then in February this year we went out with City of Toronto Cycling staff who have noted that it's a feasible route with no impact to parking.



Take action!

If you share our views and want to make this a reality, we encourage you to take action.

Attend the Riverdale Traffic Group community meeting
Wednesday, May 13th, 7pm
St. John’s Presbyterian Church, 415 Broadview Avenue

Make your voice heard, and ask for a bike route to be added to the plan, and make sure the final proposal achieves the goal of safer and more welcoming streets for everyone.

Write an email
Send your email to: riverdaletrafficwg@gmail.com
Please also cc Councillor Fletcher and Ward 30 Bikes at councillor_fletcher@toronto.ca & ward_30@cycleto.ca

Comment on the proposal at myriverdale.ca
Go to myriverdale.ca to view the proposal, and add your comments in their news section: http://www.myriverdale.ca/news/








Monday, April 20, 2015

W30B Jane's Walk: Connecting Riverdale to the Lake - A Quick Start Proposal


Join Us! Sunday, May 3rd at 10:00 am - Leslie Grove Park (corner of Queen and Jones).

Ward 30 Bikes members Michael Holloway and Don Merriam will lead a walking description and discussion of Ryerson University, School of Urban & Regional Planning, Advanced Planning Studio Fall 2014 Class Report, "Connecting Greater Riverdale to the Lake".

In the report the 4th year Ryerson Planning students identified Leslie Street as a possible Quick Start option - and the only viable connection point from the neighbourhood across Lake Shore Boulevard and the Port Lands to the Waterfront.

Image: Ward 30 Bikes' 2015 Jane's Walk page:

Click: W30B Jane's Walk: Connecting Riverdale to the Lake - A Quick Start Proposal |
http://janeswalk.org/canada/toronto/connecting-riverdale-lake-quick-start-proposal/

(See a write up about a public presentation we held at SRCHC in February of this year: Metro - February 8, 2015 | Toronto cycling group pushing for Riverdale bike lanes | http://metronews.ca/news/toronto/1282831/toronto-cycling-group-pushing-for-riverdale-bike-lanes/)

See the full report here in an "Issuu" interface: http://issuu.com/brandonquigley/docs/connecting_greater_riverdale_to_the

Or - Download the .pdf from Ward 30 Bikes' DropBox: https://www.dropbox.com/s/md354m5wm9yekag/Connecting%20Greater%20Riverdale%20to%20the%20Lake_Final%20Report.pdf?dl=0

This Jane's Walk will travel the southern portion of the Quick Start route that the Student team chose.

The walk will begin at Queen St E and Jones Avenue - the point at which the Jones Ave Bike Lanes ends - and then we'll take Rushbrooke down to Eastern Avenue. At this point the route includes a proposed Pedestrian/Cyclist refuge island at the bottom of Rushbrooke between the westerly and the easterly traffic lanes on Eastern Ave - and green painted crossing points connecting it from Rushbrooke to Mosley.

From Mosley down to the south side of the Plaza intersection 'Super Sharrows' is visioned. South of the Plaza Intersection the proposal visions narrowing the existing traffic lanes and turn lanes, and installing 1.5m wide Bike Lane - northbound and southbound.

It's complicated. But it appears to be the best solution so far that doesn't remove traffic lanes or parking.

The walk should take about 1 hour.



W30B Jane's Walk: Connecting Riverdale to the Lake - A Quick Start Proposal |
http://janeswalk.org/canada/toronto/connecting-riverdale-lake-quick-start-proposal/



mh