Sunday, June 29, 2014

@CycleToronto @Ward30Bikes Advocacy works - Flagperson on East side Crossing, Leslie/LSB to end of the Leslie reconstruction

Thanks @PaulaFletcher30 - Thanks @TTCLeslieBarns - Thanks Pomerleau construction.



7am to 7pm Monday to Friday until December (living wage and time and-a-half on holidays - and he lives in this neighbourhood).

A hellish job - buy this person a coffee and donuts every morning you commute to work safely with this person's assistance!

I've noticed an incredible increase in cycling on Queen Street this weekend. Just after the closure of Queen at Leslie; and now with World Pride (@WP14TO); and the coming exodus to the northern lakes.

Bike your hood!

We are - by Jennifer Keesmaat's account at Congress4NewUrbanism - Buffalo 2014 (CNU22) - 30,000 daily commuters!

We are a new demographic. We Ride!


Please engage in this.

We are in the midst of a complex, multidimensional cultural revolution in transportation and city building.

Your participation right now will speed the evolution towards good neighbourhoods, sustainable economies, sustainable lifestyles and sustainable identities.

How to make the intersection of Leslie Street and Lake Shore Boulevard a Complete Street - after the Leslie Street reconstruction is finished - remains @Ward30Bikes penultimate concern.

Not just about this Grand Boulevard / Neighborhood intersection - but about these motorways that divide all the neighbourhoods of the The Greater Toronto and Hamilton Area (GTHA) that circle the Great Lakes.


Michael Holloway
Captain, Ward 30 Bikes


References:


Congress4NewUrbanism Keynote - Buffalo 2014 (CNU22)


Note how Tregoning accents statistics; and Keesmaat accents buy-in. They compliment each-other.

Listen carefully.



mh

Thursday, June 12, 2014

@CycleToronto: Write PWIC before June 18th in Support of Dixon Ave Bike Lanes


Cycle Toronto
- safe streets, a healthy city, a vibrant voice -

Thursday, June 12th

Dear _________,

Please e-mail the Public Works and Infrastructure Committee (PWIC) today to help make the proposed bike lane on Dixon Avenue a reality, and improve cycling in Toronto's east end!

The next PWIC meeting takes place on June 18th, and the Dixon Ave staff report is one of the items being voted on. If PWIC adopts the report, it will go to Council on July 8th. Adding a lane on Dixon will provide a valuable neighbourhood connection between Woodbine Avenue and Kingston Road. Ward 32 Spokes and Cycle Toronto fully support the staff report - it's recommendations are strong and will make a very positive contribution to cycling in our community.

Please e-mail pwic@toronto.ca with your support for the item before June 17th at 4pm.

When writing your email, don’t hesitate to include your personal story. Consider including your mailing address, as messages from local and Toronto residents carry more weight.

Finally include item number PW32.5 in the subject line, and cc: info@cycleto.ca and ward32@cycleto.ca.


Summary of the Staff Report:


Currently, Dixon Ave. is westbound only between Lockwood to Kingston and eastbound only between Lockwood and Woodbine. See the map of the area.

- Between the westbound only section of Dixon (Kingston to Lockwood), the report recommends an eastbound contra-flow bike lane located on the south side of the street next to on-street parking. *Cyclists travelling westbound will continue to use the shared traffic lane as they do now.

- Between the eastbound only section of Dixon (Lockwood to Woodbine) the report recommends a westbound contra-flow bike lane on the north side of the street, away from the on street parking. *Cyclists travelling eastbound will continue to use the shared traffic lane as they do now.

- No changes are recommended to on street parking along the entire length of Dixon Avenue.

The installation of these two sections of contra-flow bike lane will allow cyclists to use Dixon Avenue as a two way street. These small additions to the area’s cycling infrastructure will provide valuable neighbourhood connections for cyclists of all ages who wish to avoid cycling on busy arterial roadways and major intersections.


Relevant Resources:

1) The PWIC agenda item for Dixon (PW32.5)
2) Staff presentation boards to Public Open House on the Dixon Avenue Bicycle Lane (PDF)
3) Background on “contra-flow” bike lanes


If you have any questions, please email ward32@cycleto.ca


 ---

My Letter to PWIC: 

(Use this as a template replacing my story about Dixon Ave - with your story about Dixon Ave).

TO: pwic@toronto.ca
Cc: info@cycleto.ca, ward_30@cycleto.ca, ward32@cycleto.ca
Subject Line: PW32.5 - Contra-flow Bicycle Lanes on Dixon Avenue

Public Works and Infrastructure Committee Members and Chair,

I am writing in support of an item the Committee is to consider at your meeting scheduled for June 18, 2014 - a Transportation Staff recommendation for the installation of contra-flow bicycle lanes on Dixon Avenue, from Kingston Road to Woodbine Avenue.

I am a year 'round utility and recreational cyclist. I have never had a drivers license and I do not own a motor vehicle. As a resident of Ward 30 nearby Dundas Street on Jones Avenue, the Dundas Bike Lanes are a very important transportation route for me. When I reach Kingston Road on the Dundas Bike Lane eastbound, I am forced (due to the traffic calming one-ways on Dixon), to either turn south or north on Kingston Road - a busy and fast moving Avenue with no Bicycle Infrastructure.

Annoyingly, the south bound route forces me to travel back on my easterly route in a south-westerly direction - back to Queen and Kingston Rd. - at which point I then take Queen Street East (a fast moving, busy Avenue) back eastbound over to Lockwood; then left off Queen back up northbound onto the On-Street Connection that is Dixon Avenue (which notably - gets me to Norway Avenue and Woodbine Avenue - another On-Street route on my path east - that I often take all the way over to Scarborough Road and beyond - all the way on quiet residential streets!).

The northern route around the Dixon Avenue barrier on the other hand, is on a section of Kingston Road that is marked by a steep upward incline, and a curve in the roadway at which point, simultaneously, motor vehicle traffic is travelling at a high rate of speed, accelerating and merging - and where I feel like the parked cars along the south side of the Avenue there create a pinch-point for cyclists between the parking zone and the motor vehicle traffic there. A dangerous stretch to be sure.

Thus I urge the Public Works and Infrastructure Committee to accept the Staff Report and send this recommendation for the installation of contra-flow bicycle lanes on Dixon Avenue from Kingston Road to Woodbine Avenue to City Council for a vote.


Sincerely,
Michael Holloway
# Jones Avenue,
Leslieville, Toronto

---



Use this as a template replacing my story about Dixon Ave with your story about Dixon Ave..



mh

Friday, May 30, 2014

Lake Shore Blvd / Leslie Intersection, east-side #BikeTO/#WalkTO Detour Crossing STILL a Hazard

I scouted the new construction detours at the Lake Shore Boulevard and Leslie Street Intersection on the evening of Wednesday, May 28 (4:30pm - 6:00pm). On the Friday of the previous week the @TTCLeslieBarns Leslie Street reconstruction detours were moved so that now the north-side Cyclist/Pedestrian intersection is closed - and the south side Cyclist/Pedestrian Crossing is open.

The intersection accommodates the convergence of two important east-west commute cycleways - the Martin Goodman Trail and the Lower Don Recreation Trail - which connect Scarborough and the East Side to the Downtown Core and points west.

BEFORE - South-Side-Closure - Leslie/Lake Shore Boulevard Detour Configuration (since December 2013)

AFTER - North-Side-Closure - Leslie/Lake Shore Boulevard Detour Configuration (reconfigured Friday, May 23, 2014)

Since December 2013 - when the northbound lanes of Leslie Street were closed on the south side of the Intersection I've been doing walk-abouts of this part of the site and taking video of the way Motor Vehicles and Cyclist/Pedestrians are interacting at the east-side Cyclist/Pedestrian Crossing point.

When the south side of the intersection was closed the Crossing came out of a 'doorway' in the construction fencing, 22 metres east of the actual intersection where motor vehicles were actually do the act of turning; 22 metres from where Cyclist/Pedestrian were being beckoned out into the Crossing by the blinking Walk pedestrian sign and Green Cyclist's signal - out into speeding traffic turning eastbound on LSB from northbound Leslie Street traffic flow.

This new configuration does many of the same things.

Close-up of the Leslie/Lake Shore Boulevard Detour Configuration - May 23, 2014

Here's a Video I took of the Cyclist/Pedestrian Crossing on Wednesday, May 28th at 5:30pm:

Note the 'interviewee' says in response to my question, Little scarey corner eh?".

He retorts, "Always".

Leslie and Lake Shore Boulevard - cyclist & pedestrian east-side crossing 5:30pm, May 28, 2014



I have noted - and others have been telling me of late, including the guy in the video - that this corner was dangerous even before the construction detours. When Trial Users coming from the south and from the east approach their northbound crossing right-of-way - vehicles turning from northbound Leslie are looking west on LSB, looking for a spot to slip into the fast flow on red. They don't see the Trail Users - and 'Almosts' happen Every Time you try to cross there with the Cyclist/Pedestrian Crossing signals on green. 

A 'Dutch Intersection' type configuration here would be the solution: A bump-out that forces motorists to slow to a crawl to make the corner - and as a result, come face-to-face with Trail Users as the motorist complete their turn and the Trail Users come to their right-of-way cross point.

South-Side Closure Configuration Problems


In the earlier construction configuration I asked Transportation Services to change the signal phasing to give cyclists and pedestrians a head-start - so they would be in the middle (or through) the intersection when motorists finally rounded the corner eastbound - and thus they wouldn't be as much of a surprise to motorists as they would be plainly visible out there.

I also asked Transportation to consider moving the right-turn Stop Line on Leslie, northbound. right-turn-lane onto eastbound LSB - back from the intersection as much as possible. I suggested moving it back to the usual stop line before the construction configuration (in the old configuration this would have been 17m back from where it was). This I conjectured, would have acted as a Cyclist/Pedestrian Crossing head-start signal phasing - without changing the signal phasing.

I also commented to Transportation Staff that the reason a Cyclist/Pedestrian Crossing user hadn't been hit up to that point was the lucky configuration of the corner there - being as sharp as it was around the retaing wall for the hole in the ground, it - just by happen-stance - slowed cars on that right turn just so that they weren't going so fast that they couldn't stop as cyclists and pedestrians 'popped' out of the construction fencing at the south-to-north entrance to the crossing.

My original idea that I asked Transportation to look into - and the best solution then - and now - is to put a Big Wide Yellow Flashing Crosswalk Sign across the wires supporting the traffic signals right above the east-side Cyclist/Pedestrian Crossing.


The only things done about this since December 2013 were done by @TTCLeslieBarns and Pomerleau, the TTC contractor. They made construction infrastructure changes to provide better sight-lines for pedestrians - so they could see that the intersection was extremely dangerous place to try and cross:
  • More signs,
  • A no right turn sign on read at northbound Leslie,
  • Some slight jigging of the construction fencing,
  • Cutting down of the construction retaining walls between the intersection and the crossing point. 

This - putting the onus on the vulnerable users with right-of-way - instead of what is the proper remedy, to instal infrastructure that tells motor vehicle users they are approaching a Cyclist/Pedestrian Crossing which has right-of-way in this situation.


North-Side Closure Configuration Problems: The Same - or Worse


Now with the North-side of the intersection closed, several new issues arise which put cyclists and pedestrians in the same peril - or worse peril:

Now the southbound lanes of Leslie are open and a left turn are allowed, so motor vehicles can turn eastbound onto L:SB as well as northbound traffic eastbound onto LSB - thus increasing the number of traffic vectors impacting the east-side Cyclist/Pedestrian Crossing.

Plus, now the previously sharp corner at the northbound Leslie right turn lane onto eastbound LSB, is a softer angled turn - so motorists can take the turn at a higher rate of speed as they swing around the corner and accelerate for 22 metres towards the Cyclist/Pedestrian Crossing.


This construction detour configured Cyclist/Pedestrian Crossing is essentially a mid-block crosswalk (on a fast Boulevard) ... Let's sign it that way please.


Michael Holloway
Ward 30 Bikes


Credits - Links

All images are screen-shot edits from the Construction Liaison Groups Meeting #9 Presentation PDF - from Meeting #9, held Thursday, May 1, 2014 at South Riverdale Community Health Centre, 955 Queen Street East.

TTC Leslie Barns - Construction Liaison Group page: http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/Construction_Liaison_Groups.jsp

Leslie Barns  & Connection Track - Construction Liaison Group Meeting #9 - May 1, 2014 | http://www.ttc.ca/PDF/Transit_expansion_PDFs/CLG_Meeting-9_May_1_2014.pdf



mh